+44 (0) 2920 647 656 enquires@tarn-pure.com
Residential and Sheltered Accommodation

Residential and Sheltered Accommodation

Problem:  Tarn-Pure systems are installed on many Sheltered Housing Schemes where there are difficulties using high temperature to control the growth of bacteria. This group identified difficulty in using temperature as a means of controlling and eliminating...
Care Home

Care Home

Problem:  A Health & Safety inspection had shown unacceptable legionella counts. Tarn-Pure identified several infrequently used spirs and an inability of the calorifier to deliver required water temperatures. The solution:  A Tarn-Pure unit was installed on the...
New Build Hospital

New Build Hospital

Problem: A medical treatment centre, built in 2005, had previously experienced persistent legionella counts on previous new builds. The difficulty of maintaining minimum temperatures  throughout the hot water system was a significant challenge, in spite of the design...
A Victorian Hospital

A Victorian Hospital

Problem: This is an old town hospital built in the mid-1800s. It now has 156 beds and serves as a Community and Mental Health Hospital. The water services on site are a mix of new and very old so, as the recommended temperatures could not be maintained throughout the...